Grid-connected battery storage systems: Design and installation

3 day course at WITT’s Infrastructure Training Park

New Plymouth

May 27, 2024 at 12:00am - May 30, 2024

Grid-Connected Battery Storage Systems, particularly those integrated with Grid-Connected Photovoltaic Systems, provide many valuable options to home and business owners.
With climate change being a huge environmental issue worldwide, clean energy to power communities is needed. Solar can help lower our carbon footprint and can make a huge contribution to the environment's health.

It is essential that electrical workers involved with these systems fully understand the operating theory and safety requirements in order to design and install safe and effective systems, as well as adequately manage customer expectations.

This is a recommended pre-requisite course for those wanting to install complete standalone (off-grid) systems and builds upon the basic knowledge provided in Grid-Connected Photovoltaic Systems

Click the Register button to find out more.

Read SEANZ statement of endorsement here.

 

Course structure

The delivery of this course is designed for busy tradespeople who do not have the time to attend lengthy face-to-face courses. The online component is fully flexible to allow students to complete the theory in their own time.

Pre-course learning: Online self-directed learning at your own pace, with tutor support (100 hrs)
Three day course at WITT’s Infrastructure Park, New Plymouth (24 hrs)
Post-course assignment (16 hrs)
With successful completion of the course, the applicant achieves the following NZQA framework registered micro-credential: Grid-Connected Battery Storage Systems: Design & Installation